IPR-INTAN: Transforming Agriculture
in Kota Marudu
A large-scale initiative dedicated to sustainable pineapple cultivation, supporting Malaysia’s agricultural economy.
Located in the Agropolitan Gana area of Kota Marudu, IPR-INTAN is a pioneering 500-acre MD2 Pineapple project in partnership with the Economic Ministry and Lembaga Industri Getah Sabah (LIGS). This project underscores our commitment to sustainable development and economic empowerment through large-scale pineapple cultivation.
Sustainable agriculture practices
Income generation for local communities
Enhanced crop quality and yield
0
acres planted
A significant portion of the project area is now fully cultivated, with the rest planned for further expansion.
0M
pineapple plants
Achieved by August 2024, reflecting the density and scope of the planting.
Project Progress
August 2023
PHASE 1
Site Inspection & Preparation
Initial site inspection, site clearance & soil sampling for every blocks
August 2023
PHASE 1
Planting
Planting process constantly going on. Up to August 2024, total of 2, 700, 000 plants have been planted. An acre of land has the total of 15, 000 plants.
November 2023
PHASE 1
Weed & Pest Control
Weed control are done by manual, meanwhile pest and fungi control are done as recommended by appointed agronomists.
January 2024
PHASE 1
Fertilization
Fertilization process are done following the schedule provided by the appointed agronomists.
May 2024
PHASE 1
Forcing Programe
Forcing programe are implemented to 9-months old plantation blocks. This is to ensue synchronized flowering. This is followed by pos-forcing fertilization.
Gallery
Site Inspection
Early site inspection & Soil sampling
Site Inspection
Clearing site & soil sampling for each plantation block
Road and Drainage Construction
Building road & drainage alongside with soil land preparation
Road & Drainage Construction
Drainage & road sketching
Road & Drainage Construction
Constructing drainage & road alongside with weed poisoning around plantation site
Receiving Fist Batch of Seedlings
Inspection by Biosecurity Division, Department of Agriculture Sabah before being sent to IPR Gana
Seedlings Plantation
First plantation are done on August 2023
Fertilization
Fertilization process are held as recommended by agronomist
100 days after Forcing
Watch the Blooming Stages of Our Pineapples Unfold – Click the Arrow to See the Progress!
50 Days
After Forcing
60 Days
After Forcing
70 Days
After Forcing
80 Days
After Forcing
90 Days
After Forcing
100 Days
After Forcing
Visit from Ministry of Economy, Agriculture Division